|
Categories
|
Information
|
Featured Product
|
|
|
 |
|
There are currently no product reviews.
 ;
This manual was very good & was very helpful with repairs.
Always great & fast service from Owner's manual.
 ;
Very pleased with the quality of the scan. No complaints whatsoever.
 ;
I liked the product. I would use their sevices again.
 ;
I Recently purchased yet another Service Manual from Owner-Manuals.com, this time for a Sony EVS700ES/UB Videocassette Recorder. The Manual was available for upload within two hours and is an Extremely Good copy, as some of this I was able to enlarge to get even better detail.
Once Again, Very happy with the result!
 ;
A good and useful manual. With these, We was abled to isolate and pin point the component that was causing the problem. The total time spent in troubleshooting is very much reduced.
GUIDE UP/DOWN GEAR LOADING
(L6) GEAR PULLEY (L4) (L6)
BELT LOADING PWB ASSEMBLY LOADING (L6) (S5) BASE MAIN (A) (L5) GUIDE UP/DOWN (C) (B) Fig.(C) (A)
BASE MAIN (H1)
(S4)
FRAME ASSEMBLY UP/DOWN
Fig.(5) GUIDE UP/DOWN GUIDE UP/DOWN
Fig. 4-4
5. Frame Assembly Up/Down
[Note] Put the Base Main face down(Bottom Side) 1) Release the Screw(S4) 2) Unlock the Locking Tab(L3) in direction of arrow and then lift up the Frame Assembly Up/Down to separate it from the Base Main. [Note] � When reassembling move the Guide Up/Down in direction of arrow(C) until it is positioned as Fig.(C). � When reassembling insert (A) portion of the Frame Assembly Up/Down in the (B) portion of the Guide Up/Down as Fig.(B)
8. Gear Loading (Fig. 4-4) 9. Guide Up/Down (Fig. 4-4)
1) Move the Guide Up/Down in direction of arrow(A) as Fig.(A) 2) Push the Locking Tab(L5) down and then lift up the Guide Up/Down to separate it from the Base Main. [Note] When reassembling place the Guide Up/Down as Fig.(C) and move it in direction arrow(B) until it is locked by the Locking Tab(L5). And confirm the Guide Up/Down as Fig.(A)
10. PWB Assembly Loading
[Note] Put the Base Main face down(Bottom Side) 1) Release 2 Screws(S5) 2) Unkool the Loading Motor Connector (C2) from the Hook (H1) on the Base Main. 3) Unlock 2 Locking Tabs(L6) and separate the PWB Assembly Loading from the Base Main.
6. Belt Loading(Fig. 4-4)
[Note] Put the Base Assembly Main on original position (Top Side)
7. Gear pulley (Fig. 4-4)
1) Unlock the Locking Tab(L4) in direction of arrow(B) and then separate the Gear Pulley from the Base Main.
11. Base Main(Fig. 4-4)
- 4-4 -
|
|
 |
> |
|
|
Parse Time: 0.257 - Number of Queries: 134 - Query Time: 0.059